
Add to Cart
Reasonable Price ASTM A106 Seamless Low Carbon Steel Pipe For Manufacturing
Both ERW and seamless pipes have their own unique benefits that make them ideal for different applications. ERW pipes are generally less expensive than seamless pipes, making them a good choice for large-scale projects where cost is a major factor. Seamless pipes are stronger and more resistant to corrosion than ERW pipes, making them the better choice for projects where durability is key.
There are two main types of carbon steel pipe: ERW (electric resistance welded) and seamless. ERW pipes are made from a hot-rolled coil that is unwound and then welded together. The welding process uses extreme heat to forge a strong bond between the pipes' edges. Seamless pipes are made from a solid piece of metal that is heated and then extruded into a long, continuous length. Seamless pipes do not have any welds or seams, making them incredibly strong and durable.
Product Name | big diameter ASTM A53 alloy seamless steel pipe with competitive price | |
Size | O.D | 100-750mm |
W.T | 2-50mm | |
Length | 1-12m , customized | |
Standard | AISI,ASTM,GB,DIN,BS,JIS | |
Color | black | |
Inspection | X-ray inspection, manual ultrasopic inspection,surface inspection,hydraulic testing | |
Technique | Hot Rolled | |
Section Shape | Round | |
Main Market | Southeast Asia, Middle East, Australia,USA,South America,Africa | |
Productivity | 5000 Tons/month | |
Packing | Standard bundle package Beveled end or as per request | |
Surface Treatment | Black Painted, PE Coated, Galvanized or Customized all available | |
Date of Delivery | According to The Specifications And the Quantities Of Each Contract,Time Start To Begin When We confirm the Date or L/C | |
Method Of Delivery | Terms According To the <INCOTERMS 2000> for International Trading | |
Remarks | 1.Payment Terms T/T, L/C,West Union | |
2.Trade Term:FOB/CFR/CIF , discussible | ||
3.Minimum Quantity of Order: 2 Tons | ||
4.Delivery Time:7-15 days after receipt of deposit |